COPYRIGHT MATERIAL OMITTED COPYRIGHT MATERIAL OMITTED COPYRIGHT MATERIAL OMITTED COPYRIGHT MATERIAL OMITTED COPYRIGHT MATERIAL OMITTED Victoria Clark, Environmental Defense Center, Santa Barbara, California, for petitioner Environmental Defense Center, Inc.
Andrew G. Frank and Arlene Yang, Paul, Weiss, Rifkind, Wharton & Garrison, New York, New York, and Nancy K. Stoner, Natural Resources Defense Council, Washington, D.C., for intervenor National Resources Defense Council, Inc.
R. Timothy McCrum, Ellen B. Steen, and Donald J. Kochan, Crowell & Moring, Washington, D.C., for petitioners American Forest & Paper Association and National Association of Home Builders.
Steven P. Quarles and J. Michael Klise, Crowell & Moring, Washington, D.C., and William R. Murray, American Forest & Paper Association, Washington, D.C., for petitioner American Forest & Paper Association.
Jim Mathews and Clarence Joe Freeland, Mathews & Freeland, Austin, Texas, for petitioner Texas Cities Coalition on Stormwater.
Sydney W. Falk, Jr. and William D. Dugat III, Bickerstaff, Heath, Smiley, Pollan, Kever & McDaniel, Austin, Texas, for petitioner Texas Counties Storm Water Coalition.
John C. Cruden, Daniel M. Flores and Kent E. Hanson, United States Department of Justice, Washington, D.C., and Stephen J. Sweeny, United States Environmental Protection Agency, Washington, D.C., for respondent United States Environmental Protection Agency.
On Petition for Review of an Order of the Environmental Protection Agency. EPA No. Clean Water 40 CFR.
Before: James R. Browning, Stephen Reinhardt, and Richard C. Tallman, Circuit Judges.
Opinion by Judge Browning; Partial Concurrence and Partial Dissent by Judge Tallman.
ORDER AND OPINION
ORDER
The opinion and dissent filed in this case on January 14, 2003, and published at 319 F.3d 398 are vacated. They are replaced by the Opinion and Dissent filed today.
With the filing of the new Opinion and Dissent, the panel has voted to deny the petitions for rehearing and the petition for rehearing en banc. (Judge Tallman would grant the petition for rehearing filed by the Environmental Protection Agency.) The full court has been advised of the new Opinion, new Dissent, and petition for rehearing en banc. No judge has requested a vote on the petition for rehearing en banc. Fed. R.App.P. 35.
The petitions for rehearing and the petition for rehearing en banc are DENIED. The clerk is instructed not to accept for filing any new petitions for rehearing or petitions for rehearing en banc in this case.
Each party shall bear its own costs in this appeal.
OPINION
JAMES R. BROWNING, Circuit Judge.
Petitioners challenge a rule issued by the United States Environmental Protection Agency pursuant to the Clean Water Act, 33 U.S.C. §§ 1251-1387, to control pollutants introduced into the nation's waters by storm sewers.
Storm sewers drain rainwater and melted snow from developed areas into water bodies that can handle the excess flow. Draining stormwater picks up a variety of contaminants as it filters through soil and over pavement on its way to sewers. Sewers are also used on occasion as an easy (if illicit) means for the direct discharge of unwanted contaminants. Since storm sewer systems generally channel collected runoff into federally protected water bodies, they are subject to the controls of the Clean Water Act.
In October of 1999, after thirteen years in process, the Environmental Protection Agency ("EPA") promulgated a final administrative rule (the "Phase II Rule"1 or "the Rule") under § 402(p) of the Clean Water Act, 33 U.S.C. § 1342(p), mandating that discharges from small municipal separate storm sewer systems and from construction sites between one and five acres in size be subject to the permitting requirements of the National Pollutant Discharge Elimination System ("NPDES"), 33 U.S.C. §§ 1311(a), 1342. EPA preserved authority to regulate other harmful stormwater discharges in the future.
In the three cases consolidated here, petitioners and intervenors challenge the Phase II Rule on twenty-two constitutional, statutory, and procedural grounds. We remand three aspects of the Rule concerning the issuance of notices of intent under the Rule's general permitting scheme, and a fourth aspect concerning the regulation of forest roads. We affirm the Rule against all other challenges.
I.
BACKGROUND
A. The Problem of Stormwater Runoff
Stormwater runoff is one of the most significant sources of water pollution in the nation, at times "comparable to, if not greater than, contamination from industrial and sewage sources."2 Storm sewer waters carry suspended metals, sediments, algae-promoting nutrients (nitrogen and phosphorus), floatable trash, used motor oil, raw sewage, pesticides, and other toxic contaminants into streams, rivers, lakes, and estuaries across the United States.3 In 1985, three-quarters of the States cited urban stormwater runoff as a major cause of waterbody impairment, and forty percent reported construction site runoff as a major cause of impairment.4 Urban runoff has been named as the foremost cause of impairment of surveyed ocean waters.5 Among the sources of stormwater contamination are urban development, industrial facilities, construction sites, and illicit discharges and connections to storm sewer systems.6
B. Stormwater and the Clean Water Act
Congress enacted the Clean Water Act in 1948 to "restore and maintain the chemical, physical, and biological integrity of the Nation's waters." 33 U.S.C. § 1251(a) (originally codified as the Federal Water Pollution Control Act, 62 Stat. 1155). The Clean Water Act prohibits the discharge of pollutants from a "point source"7 into the waters of the United States without a permit issued under the terms of the National Pollutant Discharge Elimination System, 33 U.S.C. §§ 1311(a), 1342, which requires dischargers to comply with technology-based pollution limitations (generally according to the "best available technology economically achievable," or "BAT" standard). 33 U.S.C. § 1311(b)(2)(A). NPDES permits are issued by EPA or by States that have been authorized by EPA to act as NPDES permitting authorities. 33 U.S.C. § 1342(a)-(b). The permitting authority must make copies of all NPDES permits and permit applications available to the public, 33 U.S.C. §§ 1342(j), 1342(b)(3); state permitting authorities must provide EPA notice of each permit application, 33 U.S.C. § 1342(b)(4); and a permitting authority must provide an opportunity for a public hearing before issuing any permit, 33 U.S.C. §§ 1342(a)(1), 1342(b)(3); cf. 33 U.S.C. § 1251(e) (requiring public participation).
Storm sewers are established point sources subject to NPDES permitting requirements. Natural Res. Def. Council v. Costle, 568 F.2d 1369, 1379 (D.C.Cir.1977) (holding unlawful EPA's exemption of stormwater discharges from NPDES permitting requirements); Natural Res. Def. Council v. EPA, 966 F.2d 1292, 1295 (9th Cir.1992).8 In 1987, to better regulate pollution conveyed by stormwater runoff, Congress enacted Clean Water Act § 402(p), 33 U.S.C. § 1342(p), "Municipal and Industrial Stormwater Discharges." Sections 402(p)(2) and 402(p)(3) mandate NPDES permits for stormwater discharges "associated with industrial activity," discharges from large and medium-sized municipal storm sewer systems, and certain other discharges. Section 402(p)(4) sets out a timetable for promulgation of the first of a two-phase overall program of stormwater regulation. Id. at § 1342(p)(2)-(4); Natural Res. Def. Council, 966 F.2d at 1296. In 1990, pursuant to § 402(p)(4), EPA issued the Phase I Rule regulating large discharge sources.9
C. The Phase II Stormwater Rule
In Clean Water Act § 402(p), Congress also directed a second stage of stormwater regulation by ordering EPA to identify and address sources of pollution not covered by the Phase I Rule. Section 402(p)(1) placed a temporary moratorium (expiring in 1994) on the permitting of other stormwater discharges pending the results of studies mandated in § 402(p)(5) to identify the sources and pollutant content of such discharges and to establish procedures and methods to control them as "necessary to mitigate impacts on water quality." 33 U.S.C. § 1342(p)(5). Section 402(p)(6) required that EPA establish "a comprehensive program to regulate" these stormwater discharges "to protect water quality," following the studies mandated in § 402(p)(5) and consultation with state and local officials. Id. at § 1342(p)(6).
EPA proposed the Phase II Rule in January of 1998.10 In October, 1999, Congress passed legislation precluding EPA from promulgating the new Rule until EPA submitted an additional report to Congress supporting certain anticipated aspects of the Rule.11 EPA was also required to publish its report in the Federal Register for public comment. Pub. L. No. 106-74, § 431(c), 113 Stat. at 1097. Later that month, EPA submitted the required ("Appropriations Act") study and promulgated the Rule.12
Under the Phase II Rule, NPDES permits are required for discharges from small municipal separate storm sewer systems ("small MS4s") and stormwater discharges from construction activity disturbing between one and five acres ("small construction sites"). 40 C.F.R. §§ 122.26(a)(9)(i)(A)-(B). Small MS4s may seek permission to discharge by submitting an individualized set of best-management plans in six specified categories, id. at § 122.34, either in the form of an individual permit application, or in the form of a notice of intent to comply with a general permit. Id. at § 122.33(b). Small MS4s may also seek permission to discharge through an alternative process, under which a permit may be sought without requiring the operator to regulate third parties, id. at §§ 122.33(b)(2)(ii), 122.26(d).13 Small construction sites may apply for individual NPDES permits or seek coverage under a promulgated general permit. Id. at § 122.26(c). EPA also preserved authority to regulate other categories of harmful stormwater discharges on a regional, as-needed basis. Id. at § 122.26(a)(9)(i)(C)-(D).
D. Facial Challenges to the Phase II Rule
The Rule was challenged in the Fifth, Ninth, and D.C. Circuits in three separate actions ultimately consolidated before the Ninth Circuit.
The Texas Cities Coalition on Stormwater and the Texas Counties Stormwater Coalition (collectively, "the Municipal Petitioners") assert that EPA lacked authority to require permitting, that its promulgation of the Rule was procedurally defective, that the Rule establishes categories that are arbitrary and capricious, and that the Rule impermissibly requires municipalities to regulate their own citizens in contravention of the Tenth Amendment and to communicate a federally mandated message in contravention of the First Amendment. The Natural Resources Defense Council ("NRDC") intervened on behalf of EPA.
Environmental Defense Center, joined by petitioner-intervenor NRDC ("the Environmental Petitioners"), asserts that the regulations fail to meet minimum Clean Water Act statutory requirements because they constitute a program of impermissible self-regulation, fail to provide required avenues of public participation, and neglect to address stormwater runoff associated with forest roads and other significant sources of runoff pollution.
The American Forest & Paper Association ("AF&PA") and the National Association of Home Builders ("the Industrial Petitioners") assert that promulgation of the Rule was procedurally defective and violated the Regulatory Flexibility Act, that EPA's retention of authority to regulate future sources of runoff pollution is ultra vires, and that the decision to regulate discharge from construction sites one to five acres in size is arbitrary and capricious. NRDC again intervened on behalf of EPA.
We have jurisdiction pursuant to section 509(b)(1) of the Clean Water Act, 33 U.S.C. § 1369(b)(1) (assigning review of EPA effluent and permitting regulations to the Federal Courts of Appeals).
II.
DISCUSSION
A. The Permit Requirements
The Municipal Petitioners' primary contention is that the Phase II Rule compels small MS4s to regulate citizens as a condition of receiving a permit to operate, and that EPA lacks both statutory and constitutional authority to impose such a requirement. Because we avoid considering constitutionality if an issue may be resolved on narrower grounds, Greater New Orleans Broadcasting Ass'n v. United States, 527 U.S. 173, 184, 119 S.Ct. 1923, 144 L.Ed.2d 161 (1999), we first ask whether the Phase II Rule is supported by statutory authority.
1. Statutory Authority
The Municipal Petitioners assert that the statutory command in Clean Water Act § 402(p)(6) that EPA develop a "comprehensive program to regulate" small MS4s did not authorize a program based on NPDES permits. Petitioners argue that because § 402(p)(6) explicitly indicates elements that the program may contain (performance standards, guidelines, etc.) without mentioning "permits," Congress must have intended that the program exclude permitting.14
The fact that "permitting" is not included on a statutory list of elements that the program "may" include is not determinative, because the list is manifestly nonexclusive. The only constraints are that the § 402(p)(6) regulations be based on the § 402(p)(5) studies, that they be issued in consultation with state and local officials, and that —"at a minimum" — they establish priorities, requirements for state stormwater management programs, and expeditious deadlines, and constitute a comprehensive program "to protect water quality." 33 U.S.C. § 1342(p)(6). EPA was free to adopt any regulatory program, including a permitting program, that included these elements. See Chevron, U.S.A. v. Natural Res. Def. Council, 467 U.S. 837, 842-43, 104 S.Ct. 2778, 81 L.Ed.2d 694 (1984) (deference to an agency's reasonable interpretation is required unless Congress expressed its intent unambiguously). It is more reasonable to interpret congressional silence about permits as an indication of EPA's flexibility not to use them than as an outright prohibition.15
The Municipal Petitioners further contend that their interpretation is supported by the structure of § 402(p), which expressly requires permits for large and medium sized MS4s in a separate section, § 402(p)(3)(B).16 However, as EPA counters, the language in § 402(p)(3) requiring permits for municipal storm sewers may be interpreted to apply both to Phase I and Phase II MS4s. Moreover, as respondent-intervenor NRDC notes, the mere existence of the § 402(p)(1) permitting moratorium, designed to apply only to Phase II dischargers, necessarily implies that EPA has the authority to require permits from these sources after the 1994 expiration of the moratorium.
Since there would have been no need to establish a permitting moratorium for these sources if the sources could never be subject to permitting requirements, petitioners' interpretation violates the bedrock principle that statutes not be interpreted to render any provision superfluous. See Burrey v. Pacific Gas & Elec. Co., 159 F.3d 388, 394 (9th Cir.1998). EPA's interpretation of its mandate under § 402(p)(6) was reasonable and EPA acted within its statutory authority in formulating the Phase II Rule as a permitting program.
2. The Tenth Amendment
The Municipal Petitioners contend that the Phase II Rule on its face compels operators of small MS4s to regulate third parties in contravention of the Tenth Amendment. We conclude that the Rule does not violate the Tenth Amendment, because it directs no unconstitutional coercion.
The Phase II Rule contemplates several avenues through which a small MS4 may obtain permission to discharge. First, if the NPDES Permitting Authority overseeing the small MS4 has issued an applicable general permit, the small MS4 may submit a notice of intent wherein the small MS4 agrees to comply with the terms of the general permit and specifies plans for implementing six "Minimum Measures" designed to protect water quality. 40 C.F.R. §§ 122.33(b)(1), 122.34(d)(1)(i), 122.34(b). Second, the small MS4 may apply for an individual permit under 40 C.F.R. § 122.34, which would again require compliance with the six Minimum Measures. Id. at §§ 122.33(b)(2)(i), 122.34(a), 122.34(b). Third, under an "Alternative Permit" option, the small MS4 may apply for an individualized permit under 40 C.F.R. § 122.26(d), the permitting program established by the Phase I Rule for large and medium-sized MS4s. Id. at §§ 122.33(b)(2)(ii), 122.26(d).17
The Minimum Measures mentioned above require small MS4s to implement programs for: (1) conducting public education and outreach on stormwater impacts, id. at § 122.34(b)(1); (2) engaging public participation in the development of stormwater management programs, id. at § 122.34(b)(2); (3) detecting and eliminating illicit discharges to the MS4, id. at § 122.34(b)(3); (4) reducing pollution to the MS4 from construction activities disturbing one acre or more, id. at § 122.34(b)(4); (5) minimizing water quality impacts from development and redevelopment activities that disturb one acre or more, id. at § 122.34(b)(5); and (6) preventing or reducing pollutant runoff from municipal activities, id. at § 122.34(b)(6).18
The Municipal Petitioners contend that the measures regulating illicit discharges, small construction sites, and development activities unconstitutionally compel small MS4 operators to regulate third parties, i.e., upstream dischargers. The Illicit Discharge Detection and Elimination measure requires that a permit seeker prohibit non-stormwater discharges to the MS4 and implement appropriate enforcement procedures. 40 C.F.R. § 122.34(b)(3)(ii)(B).19 The Construction Site Stormwater Runoff Control measure requires a permit seeker to implement and enforce a program to reduce stormwater pollutants from small construction sites. Id. at §§ 122.34(b)(4)(i)-(ii).20 It mandates erosion and sedimentation controls, site plan reviews that take account of water quality impacts, site inspections, and the consideration of public comment, and requires that construction site operators implement erosion, sedimentation, and waste management best management practices. Id. The Post-Construction/New Development measure requires permit seekers to address post-construction runoff from new development and redevelopment projects disturbing one acre or more. Id. at § 122.34(b)(5)(ii)(B).21
Noting that most MS4s are operated by municipal governments, and that "[t]he drainage of a city in the interest of the public health and welfare is one of the most important purposes for which the police power can be exercised," New Orleans Gaslight Co. v. Drainage Comm'n, 197 U.S. 453, 460, 25 S.Ct. 471, 49 L.Ed. 831 (1905), the Municipal Petitioners argue that requiring operators of small MS4s to implement "through ordinance or other regulatory mechanism" the regulations required by the Minimum Measures contravenes the Tenth Amendment. See, e.g., New York v. United States, 505 U.S. 144, 188, 112 S.Ct. 2408, 120 L.Ed.2d 120 (1992).
EPA counters that the Phase II Rule does not violate the Tenth Amendment because operators of small MS4s may opt to avoid the Minimum Measures by seeking a permit under the Alternative Permit option, 40 C.F.R. § 122.33(b)(2)(ii).22
Under the Tenth Amendment, "the Federal Government may not compel States to implement, by legislation or executive action, federal regulatory programs." Printz v. United States, 521 U.S. 898, 925, 117 S.Ct. 2365, 138 L.Ed.2d 914 (1997); see also New York, 505 U.S. at 188, 112 S.Ct. 2408. Similarly, the federal government may not force the States to regulate third parties in furtherance of a federal program. See Reno v. Condon, 528 U.S. 141, 151, 120 S.Ct. 666, 145 L.Ed.2d 587 (2000) (upholding a federal statutory scheme because it "does not require the States in their sovereign capacity to regulate their own citizens"). These protections extend to municipalities. See, e.g., Printz 521 U.S. at 931 n. 15, 117 S.Ct. 2365.
However, while the federal government may not compel them to do so, it may encourage States and municipalities to implement federal regulatory programs. See New York, 505 U.S. at 166-68, 112 S.Ct. 2408. For example, the federal government may make certain federal funds available only to those States or municipalities that enact a given regulatory regime. See, e.g., South Dakota v. Dole, 483 U.S. 203, 205-08, 107 S.Ct. 2793, 97 L.Ed.2d 171 (1987) (upholding federal statute conditioning state receipt of federal highway funds on state adoption of minimum drinking age of twenty-one). The crucial proscribed element is coercion; the residents of the State or municipality must retain "the ultimate decision" as to whether or not the State or municipality will comply with the federal regulatory program. New York, 505 U.S. at 168, 112 S.Ct. 2408. However, as long as "the alternative to implementing a federal regulatory program does not offend the Constitution's guarantees of federalism, the fact that the alternative is difficult, expensive or otherwise unappealing is insufficient to establish a Tenth Amendment violation." City of Abilene v. EPA, 325 F.3d 657, 662 (5th Cir.2003).
With the Phase II Rule, EPA gave the operators of small MS4s a choice: either implement the regulatory program spelled out by the Minimum Measures described at 40 C.F.R. § 122.34(b), or pursue the Alternative Permit option and seek a permit under the Phase I Rule as described at 40 C.F.R. § 122.26(d). Thus, unless § 122.26(d) itself offends the Constitution's guarantees of federalism, the Phase II Rule does not violate the Tenth Amendment.
Pursuing a permit under the Alternative Permit option does require permit seekers, in their application for a permit to discharge, to propose management programs that address substantive concerns similar to those addressed by the Minimum Measures. See 40 C.F.R. § 122.26(d). However, § 122.26(d) lists the requirements for an application for a permit to discharge, not the requirements of the permit itself. Therefore, nothing in § 122.26(d) requires the operator of an MS4 to implement a federal regulatory program in order to receive a permit to discharge, because nothing in § 122.26(d) specifies the contents of the permit that will result from the application process.
City of Abilene, 325 F.3d 657, provides a helpful illustration. The cities of Abilene and Irving, Texas, have populations between 100,000 and 250,000, and so were required to apply for permits under the Phase I Rule, 40 C.F.R. § 122.26(d). City of Abilene, 325 F.3d at 659-60. Under § 122.26(d) the cities were required to submit proposed stormwater management programs. Id. at 660. They negotiated the terms of those programs with EPA, and EPA eventually presented the cities with proposed management permits that contained conditions requiring the implementation of stormwater regulatory programs, and potentially requiring the regulation of third parties. Id. But, as the Fifth Circuit noted, this did not mean that the cities had no choice but to implement a federal regulatory program. Instead:
The Cities filed comments objecting to those conditions, and negotiations continued until the EPA offered the Cities the option of pursuing numeric end-of-pipe permits, which would have required the Cities to satisfy specific effluent limitations rather than implement management programs. The Cities declined this offer, electing to continue negotiations on the management permits.
Id. The Fifth Circuit rejected the cities' contention that the resulting permits violated the Tenth Amendment by requiring the cities to regulate third parties according to federal standards. Id. at 661-63. Because the cities chose to pursue the management permits despite the fact that EPA provided them with an option for obtaining permits that would not have involved implementing a management program or regulating third parties, no unconstitutional coercion occurred. Id. at 663. The ultimate decision to implement the federal program remained with the cities.
Any operator of a small MS4 that wishes to avoid the Minimum Measures may seek a permit under § 122.26(d), and, as City of Abilene demonstrates, nothing in § 122.26(d) will compel the operator of a small MS4 to implement a federal regulatory program or regulate third parties, because § 122.26(d) specifies application requirements, not permit requirements. Therefore, by presenting the option of seeking a permit under § 122.26(d), the Phase II Rule avoids any unconstitutional coercion. The Municipal Petitioners' claim that the Phase II Rule violates the Tenth Amendment therefore fails.
3. The First Amendment and the Minimum Measures
The Municipal Petitioners contend that the Public Education and Illicit Discharge Minimum Measures compel municipalities to deliver EPA's political message in violation of the First Amendment. The Phase II Rule's "Public Education and Outreach" Minimum Measure directs regulated small MS4s to "distribute educational materials to the community ... about the impacts of stormwater discharges on water bodies and the steps the public can take to reduce pollutants in stormwater runoff." 40 C.F.R. § 122.34(b)(1)(i). The "Illicit Discharge Detection and Elimination" measure requires regulated small MS4s to "[i]nform public employees, businesses, and the general public of hazards associated with illegal discharges and improper disposal of waste." 40 C.F.R. § 122.34(b)(3)(ii)(D).
The Municipal Petitioners argue that the First Amendment prohibits EPA from compelling small MS4s to communicate messages that they might not otherwise wish to deliver. They further contend that EPA's interpretation of § 402(p) as authorizing these Measures does not warrant Chevron deference because it raises serious constitutional issues, but that even if deference were given, the resulting rule is unconstitutional because neither Congress nor EPA may dictate the speech of MS4s. They contend that municipalities are protected by the First Amendment, Pacific Gas & Elec. v. Public Utilities Comm'n, 475 U.S. 1, 8, 106 S.Ct. 903, 89 L.Ed.2d 1 (1986) ("Corporations and other associations, like individuals, contribute to the [discourse] that the First Amendment seeks to foster...."), which applies as much to compelled statements of "fact" as to those of "opinion." Riley v. Nat'l Fed. of the Blind, 487 U.S. 781, 797-98, 108 S.Ct. 2667, 101 L.Ed.2d 669 (1988).
We conclude that the purpose of the challenged provisions is legitimate and consistent with the regulatory goals of the overall scheme of the Clean Water Act, cf. Glickman v. Wileman Bros. & Elliott, Inc., 521 U.S. 457, 476, 117 S.Ct. 2130, 138 L.Ed.2d 585 (1997), and does not offend the First Amendment.23 The State may not constitutionally require an individual to disseminate an ideological message, Wooley v. Maynard, 430 U.S. 705, 713, 97 S.Ct. 1428, 51 L.Ed.2d 752 (1977), but requiring a provider of storm sewers that discharge into national waters to educate the public about the impacts of stormwater discharge on water bodies and to inform affected parties, including the public, about the hazards of improper waste disposal falls short of compelling such speech.24 These broad requirements do not dictate a specific message. They require appropriate educational and public information activities that need not include any specific speech at all. A regulation is facially unconstitutional only when every possible reading compels it, Meinhold v. U.S. Dep't of Def., 34 F.3d 1469, 1476 (9th Cir.1994),25 but this is clearly not the case here.
As in Zauderer v. Office of Disciplinary Counsel of the Sup. Ct. of Ohio, 471 U.S. 626, 105 S.Ct. 2265, 85 L.Ed.2d 652 (1985), where the Supreme Court upheld certain disclosure requirements in attorney advertising, "[t]he interests at stake in this case are not of the same order as those discussed in Wooley [invalidating a law requiring that drivers display the motto `Live Free or Die' on New Hampshire license plates] ... and Barnette [forbidding the requirement that public school students salute the flag because the State may not impose on the individual `a ceremony so touching matters of opinion and political attitude']." Id. at 651. EPA has not attempted to "prescribe what shall be orthodox in politics, nationalism, religion, or other matters of opinion or force citizens to confess by word or act their faith therein." West Virginia State Bd. of Ed. v. Barnette, 319 U.S. 624, 642, 63 S.Ct. 1178, 87 L.Ed. 1628 (1943).
Informing the public about safe toxin disposal is non-ideological; it involves no "compelled recitation of a message" and no "affirmation of belief." PruneYard Shopping Ctr. v. Robins, 447 U.S. 74, 88, 100 S.Ct. 2035, 64 L.Ed.2d 741 (1980) (upholding state law protecting petitioning in malls and noting that "Barnette is inapposite because it involved the compelled recitation of a message containing an affirmation of belief"). It does not prohibit the MS4 from stating its own views about the proper means of managing toxic materials, or even about the Phase II Rule itself. Nor is the MS4 prevented from identifying its dissemination of public information as required by federal law, or from making available federally produced informational materials on the subject and identifying them as such.
Even if such a loosely defined public information requirement could be read as compelling speech, the regulation resembles another regulation that the Supreme Court has held permissible. In Glickman, 521 U.S. 457, 117 S.Ct. 2130, 138 L.Ed.2d 585, the Court upheld a generic advertising assessment promulgated by the Department of Agriculture on behalf of California tree fruit growers because the order was consistent with an overall regulatory program that did not abridge protected speech:
Three characteristics of the regulatory scheme at issue distinguish it from laws that we have found to abridge the freedom of speech protected by the First Amendment. First, the marketing orders impose no restraint on the freedom of any producer to communicate any message to any audience. Second, they do not compel any person to engage in any actual or symbolic speech. Third, they do not compel the producers to endorse or to finance any political or ideological views. Indeed, since all of the respondents are engaged in the business of marketing California nectarines, plums, and peaches, it is fair to presume that they agree with the central message of the speech that is generated by the generic program.
Id. at 469-70, 117 S.Ct. 2130 (footnotes omitted). Here, as in Glickman, the Phase II regulations impose no restraint on the freedom of any MS4 to communicate any message to any audience. They do not compel any specific speech, nor do they compel endorsement of political or ideological views. And since all permittees are engaged in the handling of stormwater runoff that must be conveyed in reasonably unpolluted form to national waters, it is similarly fair to presume that they will agree with the central message of a public safety alert encouraging proper disposal of toxic materials.26 The Phase II regulation departs only from the second element in the Glickman analysis, because the public information requirement may compel a regulated party to engage in some speech at some time; but unlike the offensive messages in Maynard and Barnette (and even the inoffensive advertising messages at issue in Glickman) that speech is not specified by the regulation.27
The public information requirement does not impermissibly compel speech, and nothing else in the Phase II Rule offends the First Amendment.28 The Rule does not compel a recitation of a specific message, let alone an affirmation of belief. To the extent MS4s are regulated by the public information requirement, the regulation is consistent with the overall regulatory program of the Clean Water Act and the responsibilities of point source dischargers.
4. Notice and Comment on the Alternative Permit Option
The Municipal Petitioners contend that, in adopting the Alternative Permit option, EPA did not comply with the minimum notice and comment procedures required in informal rulemaking by the Administrative Procedures Act ("APA"), 5 U.S.C. § 553. The APA requires an agency to publish notice of a proposed rulemaking that includes "either the terms or substance of the proposed rule or a description of the subjects and issues involved." Id. at § 553(b)(3).
We have held that a "final regulation that varies from the proposal, even substantially, will be valid as long as it is `in character with the original proposal and a logical outgrowth of the notice and comments.'" Hodge v. Dalton, 107 F.3d 705, 712 (9th Cir.1997). In determining whether notice was adequate, we consider whether the complaining party should have anticipated that a particular requirement might be imposed. The test is whether a new round of notice and comment would provide the first opportunity for interested parties to offer comments that could persuade the agency to modify its rule. Am. Water Works Ass'n v. EPA, 40 F.3d 1266, 1274 (D.C.Cir.1994).
The Municipal Petitioners argue that the Alternative Permit option is not a logical outgrowth of EPA's proposed rule because, although numerous alternatives were discussed in the Preamble to the proposed rule, 63 Fed. Reg. at 1554-1557, the Alternative Permit option eventually adopted was not. EPA counters that the proposed rule included a supplementary alternative permitting system based on concepts similar to those in the Minimum Measures, including "simplified individual permit application requirements."29 EPA contends that the Alternative Permit option was a logical outgrowth of the comments it received on the proposal expressing concern that the Minimum Measures might violate the Tenth Amendment. 64 Fed. Reg. at 68,765.
The Alternative Permit option passes the Hodge test. The proposed rule suggested an individualized permitting option to be developed in response to comments during the notice and comment period. The Alternative option contains no elements that were not part of the original rule, even if they are configured differently in the final rule. Petitioners had, and took, their opportunity to object to the aspects of the Rule that they did not support in their comments on the Minimum Measures.
B. The General Permit Option and Notices of Intent
The Environmental Petitioners contend that the general permitting scheme of the Phase II Rule allows regulated small MS4s to design stormwater pollution control programs without adequate regulatory and public oversight, and that it contravenes the Clean Water Act because it does not require EPA to review the content of dischargers' notices of intent and does not contain express requirements for public participation in the NPDES permitting process.
In reviewing a federal administrative agency's interpretation of a statute it administers, we first determine whether Congress has expressed its intent unambiguously on the question before the court. See Chevron, 467 U.S. 837, 842-44, 104 S.Ct. 2778, 81 L.Ed.2d 694 ("If the intent of Congress is clear, that is the end of the matter; for the court, as well as the agency, must give effect to the unambiguously expressed intent of Congress."). "If, instead, Congress has left a gap for the administrative agency to fill, we proceed to step two. At step two, we must uphold the administrative regulation unless it is arbitrary, capricious, or manifestly contrary to the statute." Defenders of Wildlife v. Browner, 191 F.3d 1159, 1162, amended by 197 F.3d 1035 (9th Cir.1999) (citations and internal quotations omitted).
We conclude that the Phase II General Permit option violates the Clean Water Act's requirement that permits for discharges "require controls to reduce the discharge of pollutants to the maximum extent practicable," 33 U.S.C. § 1342(p)(3)(B)(iii). We also conclude that the Phase II General Permit option violates the Clean Water Act because it does not contain express requirements for public participation in the NPDES permitting process. We remand these aspects of the Phase II Rule.30
1. Phase II General Permits and Notices of Intent
Primary responsibility for enforcement of the requirements of the Clean Water Act is vested in the Administrator of the EPA. 33 U.S.C. § 1251(d); see also 33 U.S.C. § 1361(a) ("The Administrator [of EPA] is authorized to prescribe such regulations as are necessary to carry out his functions under this chapter."). The Clean Water Act renders illegal any discharge of pollutants not specifically authorized by a permit. 33 U.S.C. § 1311(a) ("Except in compliance with this section and [other sections detailing permitting requirements] of this title, the discharge of any pollutant by any person shall be unlawful."). Under the Phase II Rule, dischargers may apply for an individualized permit with the relevant permitting authority, or may file a "Notice of Intent" ("NOI") to seek coverage under a "general permit." 40 C.F.R. § 122.33(b).
A general permit is a tool by which EPA regulates a large number of similar dischargers. Under the traditional general permitting model, each general permit identifies the output limitations and technology-based requirements necessary to adequately protect water quality from a class of dischargers. Those dischargers may then acquire permission to discharge under the Clean Water Act by filing NOIs, which embody each discharger's agreement to abide by the terms of the general permit. Because the NOI represents no more than a formal acceptance of terms elaborated elsewhere, EPA's approach does not require that permitting authorities review an NOI before the party who submitted the NOI is allowed to discharge. General permitting has long been recognized as a lawful means of authorizing discharges. Natural Res. Def. Council v. Costle, 568 F.2d 1369 (D.C.Cir.1977).
The Phase II general permitting scheme differs from the traditional general permitting model. The Clean Water Act requires EPA to ensure that operators of small MS4s "reduce the discharge of pollutants to the maximum extent practicable." 33 U.S.C. § 1342(p)(3)(B). To ensure that operators of small MS4s achieve this "maximum extent practicable" standard, the Phase II Rule requires that each NOI contain information on an individualized pollution control program that addresses each of the six general criteria specified in the Minimum Measures; thus, according to the Phase II Rule, submitting an NOI and implementing the Minimum Measures it contains "constitutes compliance with the standard of reducing pollutants to the `maximum extent practicable.'" 40 C.F.R. § 122.34(a).
Because a Phase II NOI establishes what the discharger will do to reduce discharges to the "maximum extent practicable," the Phase II NOI crosses the threshold from being an item of procedural correspondence to being a substantive component of a regulatory regime. The text of the Rule itself acknowledges that a Phase II NOI is a permit application that is, at least in some regards, functionally equivalent to a detailed application for an individualized permit. See, e.g., 40 C.F.R. § 122.34(d)(1) ("In your permit application (either a notice of intent for coverage under a general permit or an individual permit application), you must identify and submit to your NPDES permitting authority the following information . . . ."). For this reason, EPA rejected the possibility of providing a "form NOI" to Phase II permittees, explaining that "[w]hat will be required on an MS4's NOI ... is more extensive than what is usually required on an NOI, so a `form' NOI for MS4s may be impractical." 64 Fed. Reg. at 68,764.
2. Failure to Regulate
The Environmental Petitioners argue that, by allowing NPDES authorities to grant dischargers permits based on unreviewed NOIs, the Rule creates an impermissible self-regulatory system.31 Petitioners contend the Rule impermissibly fails to require that the permitting authority review an NOI to assure compliance with Clean Water Act standards, including the standard that municipal stormwater pollution be reduced to "the maximum extent practicable." 33 U.S.C. § 1342(p)(3)(B)(iii). See 40 C.F.R. § 123.35 (setting out requirements for permitting authorities, but not requiring review of NOI); 64 Fed. Reg. at 68,764 ("EPA disagrees that formal approval or disapproval by the permitting authority is needed").
EPA maintains that the Phase II permit system is fully consistent with the authorizing statute. It contends that § 402(p)(6) granted EPA flexibility in designing the Phase II "comprehensive program," and notes that while the statute does not require general permits, neither does it preclude them. EPA contends that Congress delegated the task of designing the program to EPA, and that EPA reasonably adopted a "flexible version" of the NPDES permit program to suit the unique needs of the Phase II program. It disputes that the general permit program creates "paper tigers," especially since EPA, States, and citizens may initiate enforcement actions. Finally, EPA argues that the Rule does not create a self-regulatory program, but that even if it did, nothing in § 402(p)(6) precludes such a program.
Reviewing the Phase II Rule under the first step of Chevron, we note that the plain language of § 402(p) of the Clean Water Act, 33 U.S.C. § 1342(p), expresses unambiguously Congress's intent that EPA issue no permits to discharge from municipal storm sewers unless those permits "require controls to reduce the discharge of pollutants to the maximum extent practicable."
Phase II general permits will likely impose requirements that ensure that operators of small MS4s comply with many of the standards of the Clean Water Act. Thus, general permits issued under Phase II will ordinarily contain numerous substantive requirements, just as did the permits issued under Phase I. See 40 C.F.R. §§ 123.35 & 123.35(a) ("§ 123.35 As the NPDES Permitting Authority for regulated small MS4s, what is my role? (a) You must comply with the requirements for all NPDES permitting authorities under Parts 122, 123, 124 and 125 of this chapter."); see also 40 C.F.R. § 122.28 (outlining requirements for NPDES authorities issuing general permits). And every operator of a small MS4 who files an NOI under Phase II "must comply with other applicable NPDES permit requirements, standards, and conditions established in the ... general permit." See 40 C.F.R. §§ 122.34 & 122.34(f).
However, while each Phase II general permit will likely ensure that operators of small MS4s comply with certain standards of the Clean Water Act, they will not "require controls to reduce the discharge of pollutants to the maximum extent practicable." According to the Phase II Rule, the operator of a small MS4 has complied with the requirement of reducing discharges to the "maximum extent practicable" when it implements its stormwater management program, i.e., when it implements its Minimum Measures. 40 C.F.R. § 122.34(a); see also 64 Fed. Reg. at 68753 (stating EPA's anticipation that limitations more stringent that the minimum control measures "will be unnecessary"). Nothing in the Phase II regulations requires that NPDES permitting authorities review these Minimum Measures to ensure that the measures that any given operator of a small MS4 has decided to undertake will in fact reduce discharges to the maximum extent practicable.32
See 40 C.F.R. § 123.35 ("As the NPDES Permitting Authority for regulated small MS4s, what is my role?"). Therefore, under the Phase II Rule, nothing prevents the operator of a small MS4 from misunderstanding or misrepresenting its own stormwater situation and proposing a set of minimum measures for itself that would reduce discharges by far less than the maximum extent practicable.
In fact, under the Phase II Rule, in order to receive the protection of a general permit, the operator of a small MS4 needs to do nothing more than decide for itself what reduction in discharges would be the maximum practical reduction. No one will review that operator's decision to make sure that it was reasonable, or even good faith.33 Therefore, as the Phase II Rule stands, EPA would allow permits to issue that would do less than require controls to reduce the discharge of pollutants to the maximum extent practicable.34 See 64 Fed. Reg. at 68753 (explaining that the minimum control measures will protect water quality if they are "properly implemented"). We therefore must reject this aspect of the Phase II Rule as contrary to the clear intent of Congress. Cf. Natural Res. Def. Council, 966 F.2d at 1305 (rejecting as arbitrary and capricious a permitting system that allowed regulated industrial stormwater dischargers to "self-report" whether they needed permit coverage).
Involving regulated parties in the development of individualized stormwater pollution control programs is a laudable step consistent with the directive to consult with state and local authorities in the development of the § 402(p)(6) comprehensive program. But EPA is still required to ensure that the individual programs adopted are consistent with the law. Our holding should not prevent the Phase II general permitting program from proceeding mostly as planned. Our holding does not preclude regulated parties from designing aspects of their own stormwater management programs, as contemplated under the Phase II Rule. However, stormwater management programs that are designed by regulated parties must, in every instance, be subject to meaningful review by an appropriate regulating entity to ensure that each such program reduces the discharge of pollutants to the maximum extent practicable. We therefore remand this aspect of the Rule.
3. Public Participation
The Environmental Petitioners contend that the Phase II Rule fails to provide for public participation as required by the Clean Water Act, because the public receives neither notice nor opportunity for hearing regarding an NOI. The EPA replies on the one hand by arguing that NOIs are not "permits" and therefore are not subject to the public availability and public hearing requirements of the Clean Water Act, and on the other hand by arguing that the combination of the public involvement minimum measure, 40 C.F.R. § 122.34(b)(2), the Federal Freedom of Information Act, 5 U.S.C. § 552, and state freedom of information acts would fulfill any such requirements if NOIs were permits.
Reviewing the Phase II Rule under Chevron step one, we conclude that clear Congressional intent requires that NOIs be subject to the Clean Water Act's public availability and public hearings requirements. The Clean Water Act requires that "[a] copy of each permit application and each permit issued under [the NPDES permitting program] shall be available to the public," 33 U.S.C. § 1342(j), and that the public shall have an opportunity for a hearing before an permit application is approved, 33 U.S.C. § 1342(a)(1). Congress identified public participation rights as a critical means of advancing the goals of the Clean Water Act in its primary statement of the Act's approach and philosophy. See 33 U.S.C. § 1251(e); see also Costle v. Pacific Legal Found., 445 U.S. 198, 216, 100 S.Ct. 1095, 63 L.Ed.2d 329 (1980) (noting the "general policy of encouraging public participation is applicable to the administration of the NPDES permit program"). EPA has acknowledged that technical issues relating to the issuance of NPDES permits should be decided in "the most open, accessible forum possible, and at a stage where the [permitting authority] has the greatest flexibility to make appropriate modifications to the permit." 44 Fed. Reg. 32,854, 32,885 (June 7, 1979).
As we noted above, under the Phase II Rule it is the NOIs, and not the general permits, that contain the substantive information about how the operator of a small MS4 will reduce discharges to the maximum extent practicable. Under the Phase II Rule, NOIs are functionally equivalent to the permit applications Congress envisioned when it created the Clean Water Act's public availability and public hearing requirements. Thus, if the Phase II Rule does not make NOIs "available to the public," and does not provide for public hearings on NOIs, the Phase II Rule violates the clear intent of Congress. EPA's first argument — that NOIs are not subject to the public availability and public hearings requirements of the Clean Water Act — therefore fails.
We therefore reject the Phase II Rule as contrary to the clear intent of Congress insofar as it does not provide for public hearings on NOIs as required by 33 U.S.C. § 1342(a)(1). However, Congress has not directly addressed the question of what would constitute an NOI being "available to the public" as required by 33 U.S.C. § 1342(j). Under Chevron step two, we must defer to EPA's interpretation of "available to the public" unless it is arbitrary, capricious, or manifestly contrary to the statute.
EPA argues that the NOIs are "available to the public" as a result of the combined effects of the public participation minimum measures, and of federal and state freedom of information acts. This argument is unconvincing. First, the public participation Minimum Measure only requires dischargers to design a program minimally consistent with State, Tribal, and local requirements. 40 C.F.R. § 122.34(b)(2). Second, the federal Freedom of Information Act only applies to documents that are actually in EPA's possession, not to documents that are in the possession of state or tribal NPDES authorities, see 40 C.F.R. § 2 (providing EPA's policy for releasing documents under the federal Freedom of Information Act), and nothing in the Phase II Rule provides that EPA obtain possession of every NOI that is submitted to a NPDES permitting authority. See 40 C.F.R. § 123.41(a) (making information provided to state NPDES authorities available to EPA only upon request). Thus, under the Phase II Rule, NOIs will only "be available to the public" subject to the vagaries of state and local freedom of information acts. We conclude that EPA's interpretation of 33 U.S.C. § 1342(j), as embodied in the provisions of the Phase II Rule providing for the public availability of NOIs, is manifestly contrary to the Clean Water Act, which contemplates greater scope, greater certainty, and greater uniformity of public availability than the Phase II Rule provides. We therefore reject this aspect of the Phase II Rule.35
In sum, we conclude that EPA's failure to require review of NOIs, which are the functional equivalents of permits under the Phase II General Permit option, and EPA's failure to make NOIs available to the public or subject to public hearings contravene the express requirements of the Clean Water Act. We therefore vacate those portions of the Phase II Rule that address these procedural issues relating to the issuance of NOIs under the Small MS4 General Permit option, and remand so that EPA may take appropriate action to comply with the Clean Water Act.
C. Failure to Designate
We reject the Environmental Petitioners' contention that EPA's failure to designate for Phase II regulation serious sources of stormwater pollution, including certain industrial ("Group A") sources and forest roads, was arbitrary and capricious. See Marsh v. Oregon Natural Res. Council, 490 U.S. 360, 378, 109 S.Ct. 1851, 104 L.Ed.2d 377 (1989).36
1. "Group A" Facilities
In addition to the small MS4s and construction sites ultimately designated for regulation under the Phase II Rule, EPA evaluated a variety of other point-source discharge categories for potential Phase II regulation. One group of dischargers (referred to as the "Group A" facilities) included sources that "are very similar, or identical" to regulated stormwater discharges associated with industrial activity that were not designated for Phase I regulation for administrative reasons unrelated to their environmental impacts.37 64 Fed. Reg. at 68,779. EPA estimates that Group A includes approximately 100,000 facilities, including auxiliary facilities and secondary activities ("e.g., maintenance of construction equipment and vehicles, local trucking for an unregulated facility such as a grocery store," id.) and facilities intentionally omitted from Phase I designation ("e.g., publicly owned treatment works with a design flow of less than 1 million gallons per day, landfills that have not received industrial waste," id.).
The Environmental Petitioners contend that EPA should have designated the Group A facilities for categorical Phase II regulation after finding (1) that stormwater discharges from these facilities are the same as those from the industrial sources regulated under Phase I, and (2) that such discharges may cause "adverse water quality impacts." Id. Petitioners argue that these findings, and EPA's failure to provide individualized analysis regarding whether any specific source category within Group A requires regulation, render EPA's decision not to regulate any of these sources under the Rule arbitrary and capricious. They maintain that EPA's "line-drawing," which regulates some pollution sources but leaves nearly identical sources unregulated without any persuasive rationale, is necessarily arbitrary and capricious. See Natural Res. Def. Council, 966 F.2d at 1306 (EPA's decision not to regulate construction sites smaller than five acres was arbitrary when EPA provided no data to justify the five-acre threshold and admitted that unregulated sites could have significant water quality impacts).
Petitioners argue that § 402(p)(6) at least required EPA to make findings with respect to individual Group A categories, and that data collected from Phase I permit applications could be used to evaluate the pollutant potential of the identical Group A sources. They contend that these findings should have sufficed as a basis for designating at least some Group A sources, and that EPA's conclusion that it lacked adequate nationwide data upon which to designate any of these sources is not supported by the record evidence. Comparing EPA's identification of the serious polluting potential of some of these sources with its statutory mandate under § 402(p)(6) "to protect water quality," they argue that EPA fails even the forgiving standard of arbitrary and capricious review in that it has "offered an explanation for its decision that runs counter to the evidence before [it]" and "is so implausible that it could not be ascribed to a difference in view or the product of agency expertise." See Motor Vehicle Mfrs., 463 U.S. at 43, 103 S.Ct. 2856.
EPA maintains that it considered Group A facilities' similarity to already regulated sources as only one of several criteria that it used in designating sources for regulation under Phase II, 64 Fed. Reg. at 68,780, and that sources that appear "similarly situated" under one criterion are not necessarily similarly situated under all. EPA asserts that nothing in § 402(p)(6) implied a responsibility to make individualized findings regarding each Group A subcategory, and it maintains that it simply lacked sufficient data to support nationwide designation of the Group A facilities. EPA notes that, after failing to receive requested comment providing such data, it proposed instead "to protect water quality" by allowing regional regulation of problem Group A facilities under the residual designation authority. EPA contends that agencies must be afforded deference in determining the data necessary to support regulatory decisionmaking and that it reasonably determined the quantum of data it would need to support the designation of additional sources on a nationwide basis. See Sierra Club v. EPA, 167 F.3d 658, 662 (D.C.Cir.1999).
We conclude that sufficient evidence supports EPA's decision not to designate Group A sources on a nationwide basis, and instead to establish local and regional designation authority to account for these sources and protect water quality. Although we are troubled by the purely administrative basis for the distinction between facilities regulated under the Phase I Rule and the Group A facilities that remain unregulated under Phase II,38 EPA's choice of the Phase I standard for designation is not the issue before us. Before us is whether EPA acted arbitrarily in declining to designate the Group A sources on a nationwide basis under the Phase II Rule, and we cannot say that it did.
EPA has articulated a rational connection between record facts indicating insufficient data to categorically regulate Group A facilities and its corresponding conclusion not to do so, and we defer to that decision. See Washington v. Daley, 173 F.3d 1158, 1169 (9th Cir.1999). In the text of the Rule, EPA explains that the process behind its decision not to nationally designate Group A sources for Phase II regulation focused not only on the likelihood of contamination from a source category, but also on the sufficiency of national data about each category and whether pollution concerns were adequately addressed by existing environmental regulations.39 We cannot say that EPA relied on factors Congress had not intended it to consider, that it failed to consider an important aspect of the problem, or that its rationale is implausible. See Motor Vehicle Mfrs., 463 U.S. at 43, 103 S.Ct. 2856. Nor did EPA's decision run counter to the evidence before it. Id. The Environmental Petitioners allege that its decision not to regulate Group A facilities runs counter to evidence that similar sources are highly polluting, but as EPA considered evidence beyond those similarities that persuaded it not to regulate, we cannot say that EPA's decision is unsupported by the record. Nothing in § 402(p)(6) unambiguously requires EPA to evaluate the Group A source categories individually, and we defer to EPA's interpretation of the statute it is charged with administering. See Royal Foods Co. v. RJR Holdings, 252 F.3d 1102, 1106 (9th Cir.2001).
2. Forest Roads
The Environmental Petitioners also contend that EPA arbitrarily failed to regulate forest roads under the Rule despite clear evidence in the record documenting the need for stormwater pollution control of drainage from these roads. Petitioners again contend that this agency action is arbitrary, because EPA has offered an explanation for its decision that runs counter to the evidence before it.
Petitioners point to EPA's own conclusion that forest roads "are considered to be the major source of erosion from forested lands, contributing up to 90 percent of the total sediment production from forestry operations."40 They note that both unimproved forest roads and construction sites create large expanses of non-vegetated soil subject to stormwater erosion, and argue that construction site data thus also support regulation of forest roads. Petitioners observe that EPA has cited no contrary evidence indicating that forest roads are not sources of stormwater pollutant discharges to U.S. waters, and they argue that Phase II regulation is necessary "to protect water quality," because proper planning and road design can minimize erosion and prevent stream sedimentation. Petitioners note that this court has previously held that, in the absence of such "supportable facts," EPA is not entitled to the usual assumption that it has "rationally exercised the duties delegated to it by Congress." Natural Res. Def. Council, 966 F.2d at 1305.
EPA's response is that we have no jurisdiction to hear this challenge, chiefly because, it believes, the challenge is time-barred by Clean Water Act § 509(b)(1), 33 U.S.C. § 1369(b)(1) (providing that "application for review shall be made within 120 days from the date of [agency action]"). EPA promulgated silviculture regulations in 1976 that exclude from NPDES permit requirements certain silvicultural activities that EPA determined constitute non-point source activities, including "surface drainage, or road construction and maintenance from which there is natural runoff." 40 C.F.R. § 122.27(b)(1).41 EPA asserts that the exclusion applies to forest roads in general, not only to "construction" and "maintenance" — an assertion disputed by Petitioners — and that any challenge to the decision not to regulate forest roads should have been brought within 120 days of the promulgation of that rule. See 33 U.S.C. § 1369(b)(1).
EPA's argument might be more persuasive if Petitioners' contention could be understood essentially as a direct challenge to the 1976 silviculture regulations, but this is not the case. Even were we to assume that EPA exempted forest roads from NPDES permit requirements in 1976 under 40 C.F.R. § 122.27(b)(1), that would not resolve the question whether EPA should have addressed forest roads in its "comprehensive program ... to protect water quality" under § 402(p)(6), because § 402(p)(6) was not enacted until 1987. Petitioners challenge EPA's decision not to regulate under the new portion of the statute, not the decision not to regulate under other provisions that were in effect earlier.
EPA argues in the alternative that Petitioners should have sought judicial review when EPA considered amending § 122.27(b)(1)—to delete the language that it asserts renders forest roads non-point sources—but then determined not to make the amendment. However, we are aware of no statute or legal doctrine providing that a party's failure to challenge an agency's decision not to amend its rules in one proceeding deprives the party of the right to challenge, in a contemporaneous proceeding, the promulgation of an entire new rule which could have, but did not, provide the full relief the party seeks. Assuming that EPA is correct that § 122.27(b)(1) defines forest roads as non-point sources, both the Phase II Rule proceedings and the proceedings in which the proposed amendment to § 122.27(b)(1) was considered and rejected were proper proceedings in which to raise the issue whether discharges from forest roads should be regulated. Petitioners chose to raise the issue in their comments to the proposed Phase II Rule, because they believed that Clean Water Act § 402(p)(6) mandates the regulation of forest roads. They did not lose their right to challenge the final Phase II Rule's failure to regulate forest roads simply because they did not also raise a challenge to EPA's failure to adopt an amendment to § 122.27(b)(1) that the agency initially proposed. (We note, incidentally, that it appears that even a successful challenge to § 122.27(b)(1) would likely not have achieved the objective the Environmental Petitioners sought: it would only have allowed case-by-case coverage for forest roads, and not for overall coverage.)
Finally, EPA suggests that Petitioners' comments during the Phase II rulemaking process were too short to create jurisdiction in this court to hear this challenge. However, EPA exaggerates the slightness of those comments, which comprised two paragraphs, with footnotes, stating objections and providing support. We also agree with Petitioners that EPA was aware of the forest road sedimentation problem at the time of the rulemaking.42 Indeed, EPA responded to the comments without disputing that the problem is serious. 3 EPA, Response to Public Comments 8 (Oct. 29, 1999). Rather, the agency relied on 40 C.F.R. § 122.27(b)(1), indicating that it was barred from acting under the Phase II Rule by § 122.27(b)(1).
EPA does not seriously address the merits of Petitioners' objections to the Rule in its brief to this court. Instead, EPA relies almost entirely on its assertion that we lack jurisdiction to decide this question. It does, however, strongly imply that its failure to adopt its own proposed amendment in the proceeding pertaining to § 122.27(b)(1) relieves it of its obligation to consider including forest roads in the Phase II Rule proceedings. We reject any such contention. Petitioners' assertion that § 402(p)(6) requires that the Phase II Rule contain provisions regulating forest roads necessitates a response from EPA on the merits.
Having concluded that the objections of the Environmental Petitioners are not time-barred, and that we have jurisdiction to hear them, but that EPA failed to consider those objections on the merits, we remand this issue to the EPA, so that it may consider in an appropriate proceeding Petitioners' contention that § 402(p)(6) requires EPA to regulate forest roads. EPA may then either accept Petitioners' arguments in whole or in part, or reject them on the basis of valid reasons that are adequately set forth to permit judicial review.
D. AF&PA's Standing
The American Forestry & Paper Association (AF&PA), a national trade association representing the forest, pulp, paperboard, and wood products industry, is one of the two Industry Petitioners asserting the remaining claims.43 Before considering these challenges, however, we consider whether AF&PA has standing to raise them.
EPA argues that AF&PA lacks standing because it cannot show that it represents entities that suffer a cognizable injury under the Phase II Rule as promulgated. EPA argues that the interests of AF&PA entities might have supported standing had EPA decided to regulate forest roads as Phase II stormwater dischargers, but since EPA declined to do so, none of AF&PA's members are currently subject to the Rule. AF&PA contends that its members have a cognizable legal interest in the Rule because they risk becoming subject to regulation at any future time under the continuing designation authority.
We agree that AF&PA lacks standing. A claimant meeting Article III standing requirements must show that "(1) it has suffered an `injury in fact' ...; (2) the injury is fairly traceable to the challenged action of the defendant; and (3) it is likely, as opposed to merely speculative, that the injury will be redressed by a favorable decision." Friends of the Earth v. Laidlaw Envtl. Servs. (TOC), 528 U.S. 167, 180-81, 120 S.Ct. 693, 145 L.Ed.2d 610 (2000). Standing requires an injury that is "actual or imminent, not `conjectural or hypothetical.'" Lujan v. Defenders of Wildlife, 504 U.S. 555, 560, 112 S.Ct. 2130, 119 L.Ed.2d 351 (1992). AF&PA's interest in avoiding future regulation of forest roads is not actually or imminently threatened by any potential result in this case. No ripe claim about misuse of the residual authority to regulate forest road discharge, or any other kind of discharge, is before the court. Should members of AF&PA become subject to Phase II regulation through subsequent administrative action, it will have standing to challenge those actions at that time. In the meanwhile, we proceed to the merits of the remaining claims on behalf of AF&PA's co-petitioner, the National Association of Home Builders, which has established its standing to raise them.
E. Consultation with State and Local Officials
The Industry Petitioners contend that EPA failed to consult with the States on the Phase II Rule as required by § 402(p)(5), which instructs EPA to conduct studies "in consultation with the States," and § 402(p)(6), which instructs the Administrator to issue regulations based on these studies "in consultation with State and local officials." 33 U.S.C. §§ 1342(p)(5)-(6). We conclude that EPA satisfied its statutory duty of consultation. See Marsh, 490 U.S. at 378, 109 S.Ct. 1851.
Petitioners concede several instances in which EPA circulated drafts of the Phase II Rule to state and local authorities, but argue that these consultations were meaningless because (1) the reports were circulated too far in advance of the actual rulemaking, (2) the rulemaking wrongfully proceeded based on other sources of input, (3) standard APA notice and comment procedures could not suffice because Congress must have intended something more when it added the consultation requirements to the language of § 402, and (4) consultation at the final stage of rulemaking was inadequate because comment was sought on the final report only after it had been submitted to Congress and the Phase II Rule had been promulgated. Petitioners provide examples of state feedback that allegedly went unheeded by EPA in its promulgation of the final Rule.
EPA maintains that it consulted extensively with States and localities in developing the Phase II Rule, discharging its obligations under §§ 402(p)(5) & (6). EPA contends that the comments Petitioners cite as unheeded by EPA demonstrate that EPA did consult with States concerning the Rule, even if some States did not concur in EPA's ultimate conclusion, and that the final rule adopted a good measure of the flexibility sought by state representatives. EPA argues that Industry Petitioners cannot complain that consultation was inadequate simply because it did not result in the adoption of Petitioners' preferred views.
EPA also disputes Petitioners' allegation that while EPA did comply with the terms of the 1999 Appropriations Act (requiring EPA to defend the proposed Phase II Rule before Congress and then publish the final report for public comment), it demonstrated its failure to adequately consult by publishing the report for public comment after the Phase II Rule had been formally promulgated, rendering any subsequent public comment meaningless. EPA counters that these actions do not indicate that it failed to satisfy Congress's directive that it consult with state and local officials, because EPA had engaged in extensive consultation before Congress requested the Appropriations Act report, and Congress did not require further consultation when it conditioned promulgation of the Rule only on the submission of this final report. EPA claims that while Congress required it to publish the report after its submission, public comment on the report was not required before promulgation, and that the statutory deadline structure rendered any other interpretation impossible.
We conclude that the overall record indicates EPA met its statutory duty of consultation. A draft of the first report was circulated to States, EPA regional offices, the Association of State and Interstate Water Pollution Control Administrators ("ASIWPCA"), and other stakeholders in November, 1993, and was revised based on comments received. EPA established the Urban Wet Weather Flows Federal Advisory Committee ("FACA Committee"), balancing membership between EPA's various outside stakeholder interests, including representatives from States, municipalities, Tribes, commercial and industrial sectors, agriculture, and environmental and public interest groups. 64 Fed. Reg. 68,724. The 32 members of the Phase II FACA Subcommittee, reflecting the same balance of interests, met fourteen times over three years and state and municipal representatives provided substantial input regarding the draft reports, the ultimate Phase II Rule, and the supporting data.44 Id. EPA instituted the Phase II Subcommittee meetings in addition to the standard APA notice and comment procedures, which EPA also followed.
The fact that the Rule did not conform to Petitioners' hopes and expectations does not bear on whether EPA adequately consulted state and local officials. Although required to consult with States and localities, EPA was free to chart the substantive course it saw fit. EPA was not required to consult with States on the Appropriations Act report. Even if EPA should have sought further comment at that late stage, failure to do so does not outweigh the evidence demonstrating extensive consultation and cooperation with local authorities on development of the Rule.
F. Designation of Certain Small MS4s and Construction Sites
The Industry Petitioners contend that, in designating certain small MS4s and construction sites for regulation under the Phase II Rule, EPA failed to adhere to the statutorily required regulatory basis and misinterpreted record evidence. We disagree.
1. Regulatory Basis
The Industry Petitioners and the Municipal Petitioners contend that EPA violated the statutory command to base the Phase II regulations on § 402(p)(5) studies. We review EPA's interpretation of its statutory authority under the Chevron standard, 467 U.S. at 842-44, 104 S.Ct. 2778, and affirm.
Petitioners argue that the studies mandated by § 402(p)(5) were intended to provide the sole substantive basis for the "comprehensive program" envisioned in § 402(p)(6), but that EPA also (and thus improperly) based its designation of small MS4s and construction sites on (1) public comment received in the aftermath of judicial invalidation of the scope of construction sites regulated by the Phase I Rule,45 and (2) additional research discussed in the Preamble to the Phase II Rule.46
EPA contends that the statute did not require it to base its designations exclusively on the § 402(p)(5) studies, and that it was in fact required to take account of information from other sources in promulgating the regulations. It argues that it based the Phase II Rule on conclusions reported in the § 402(p)(5) studies, but then appropriately supported these results with data described in the additional study requested by Congress in the Appropriations Act, comments submitted during the statutorily required notice-and-comment process, and other available information. To read the authorizing statute as limiting reliance to the § 402(p)(5) studies, EPA claims, would preclude it from relying on recommendations received through the separate, post-study requirement to "consult with State and local officials" under § 402(p)(6), and through the notice and comment process mandated by the APA, 5 U.S.C. § 553(b).
Respondent-intervenor NRDC adds that the Phase II Rule is consistent with the § 402(p)(5) studies reported in 1995, and moreover, that the Industry Petitioners lack standing to raise the "regulatory basis" claim because they cannot show the requisite injury. See Friends of the Earth, 528 U.S. at 180-81, 120 S.Ct. 693.
a. Standing. Industry Petitioners47 contend that they have suffered injury in fact, because their members are now either automatically regulated by the permitting requirements or subject to future regulation (under the residual authority, discussed below) that otherwise would not have been authorized, and that this is a direct result of EPA's failure to adhere to the framework of the 1995 Report, which allegedly would have precluded these aspects of the Rule. NRDC contends that the Industry Petitioners lack standing because they cannot show that being subject to NPDES permitting is the causal result of the procedural injury they urge, and because they cannot base standing on hypothetical injury that may arise in the future.
NRDC argues that the injuries Petitioners allege are not consistent with the guidelines laid out in Friends of the Earth, 528 U.S. at 180-81, 120 S.Ct. 693. It insists that Petitioners' only possible claims of injury from the alleged "regulatory basis" violation are purported harm to members caused by the final Phase II Rule itself or harm to members caused by EPA's alleged failure to provide adequate notice of future regulatory requirements in the 1995 Report. However, NRDC contends that Petitioners have not suffered the requisite injury, because they had actual notice that EPA might regulate small construction sites, 63 Fed. Reg. at 1583, and they can show no chain of causation linking their alleged injury from the Rule itself to the actions challenged here.
NRDC's causation argument is complex. Although the Petitioners purport to challenge EPA's failure to follow all of the 1995 Report's recommendations in the final Phase II Rule, NRDC contends, they are really challenging the subsequent proceedings through which EPA developed the final Rule. Even if there were some unlawful variance between the 1995 report and final rule, NRDC continues, the cause of that variance would have been some failure to abide by rulemaking standards during administrative proceedings that produced the text of the final Rule—not EPA's attention to sources of input other than the 1995 Report. NRDC maintains that these intervening acts of rulemaking (e.g., Phase II Subcommittee activities and the notice-and-comment process) break the requisite chain of causation between EPA's alleged failure to adhere to recommendations in the 1995 report and the flaws Petitioners allege in the Phase II Rule, which NRDC claims would have been due to "purportedly unlawful EPA decisions on the merits during the subsequent administrative proceedings." See Northside Sanitary Landfill v. Thomas, 804 F.2d 371, 381-84 (7th Cir.1986) (finding no standing to challenge EPA statements concerning the fate of a hazardous waste facility when subsequent state administrative acts, not EPA comments, would determine the facility's actual fate).
We note that NRDC's standing arguments apply equally to the Municipal Petitioners, who can also assert only the harms resulting to members from the Rule itself or from a lack of notice, and that we are thus not only considering the standing of the Industry Petitioners but also that of the Municipal Petitioners to raise the "regulatory basis" claim.48 That established, we find standing for both.
NRDC essentially argues that petitioners lack standing because (1) they cannot show that being subject to NPDES permitting is the causal result of the procedural injury they urge, (2) they cannot claim any actual notice injury from the alleged procedural wrong because notice was actually given, and (3) they cannot claim standing based on hypothetical injury that may (or may not) arise from future regulation under the residual authority. We can readily agree with the latter two contentions. As discussed above, the "actual injury" requirement of Article III standing precludes judicial consideration of exactly the kind of hypothetical harm the Industry Petitioners allege may follow from use of Phase II authority for future designations of regional sources. Friends of the Earth, 528 U.S. at 180-81, 120 S.Ct. 693. If future Phase II designations cause identifiable injury to Petitioners, they will then be free to pursue that ripe claim. And because EPA clearly issued notice to all regulated parties that they may be subject to regulation under the proposed rule, 63 Fed. Reg. at 1568 (MS4s) and 1582 (construction), petitioners cannot show injury from lack of actual notice.
However, NRDC's causation argument is less persuasive. NRDC correctly argues that the petitioners cannot establish a definite chain of causation between the EPA's alleged failure to limit their regulatory basis to the § 402(p)(5) studies and the fact that they now must obtain permits. But this will almost always be true of petitions challenging an agency's failure to abide by statutory procedural requirements. Because all administrative decisionmaking following an alleged procedural irregularity could always be considered an intervening factor breaking the chain of causation, NRDC's interpretation of the requisite chain of causation would dubiously shield administrative decisions from procedural review.
For this reason, we have held that the failure of an administrative agency to comply with procedural requirements in itself establishes sufficient injury to confer standing, even though the administrative result might have been the same had proper procedure been followed. City of Davis v. Coleman, 521 F.2d 661, 671 (9th Cir.1975) (agency's failure to comply with National Environmental Policy Act's procedural requirements constituted injury sufficient to support standing of a geographically related plaintiff regardless of potentially similar regulatory outcome). In City of Davis, we noted that the standing inquiry represents "a broad test, but because the nature and scope of environmental consequences are often highly uncertain before study we think it an appropriate test." Id. A plaintiff who shows that a causal relation is "probable" has standing, even if the chain cannot be definitively established. Johnson v. Stuart, 702 F.2d 193, 195-96 (9th Cir.1983) (school students and their parents had standing to challenge a statute that limited the texts that might be selected for teaching, even though it could not be shown whether any specific book had been rejected under this statute or for other reasons).
The Supreme Court has also acknowledged that standing may be established by harm resulting indirectly from the challenged acts, Warth v. Seldin, 422 U.S. 490, 504-05, 95 S.Ct. 2197, 45 L.Ed.2d 343 (1975), and that causation may be established if the plaintiff shows a good probability that, absent the challenged action, the alleged harm would not have occurred, Arlington Heights v. Metro. Hous. Dev. Corp., 429 U.S. 252, 262-64, 97 S.Ct. 555, 50 L.Ed.2d 450 (1977).
Thus, although the petitioners cannot show with certainty that the alleged "regulatory basis" violation caused them to be wrongfully subjected to Phase II permitting requirements, we hold that they have alleged a procedural injury sufficient to support their standing to bring the claim.
b. Merits. Although we resolve the standing issue in favor of the petitioners, we nevertheless affirm the Rule against their claim that EPA violated procedural constraints implied by the authorizing statute, § 402(p)(6).
Congress intended EPA to use all sources of information in developing a comprehensive program to protect water quality to the maximum extent practicable. The statute unambiguously required EPA to base its regulations both on the § 402(p)(5) studies and on consultation with state and local officials. Congress enacted § 402 with full knowledge that EPA would also be required to take account of public comments during the notice and comment phase of administrative rulemaking prescribed by the APA.49
2. MS4s in Urbanized Areas
The Municipal Petitioners contend that the designation of small MS4s for Phase II regulation according to Census Bureau defined areas of population density ("urbanized areas") is arbitrary and capricious. They argue that EPA has not established that the Census Bureau's designation of urbanized areas is correlated with actual levels of pollution runoff in stormwater, and that EPA adopted the designations simply for administrative convenience. We affirm, because the record reflects a reasoned basis for EPA's decision. See Marsh, 490 U.S. at 378, 109 S.Ct. 1851.
Conceding that the Preamble cites studies purporting to establish "a high correlation between the degree of development/urbanization and adverse impacts on receiving waters due to stormwater," 64 Fed. Reg. at 68,751, the Municipal Petitioners nevertheless contend that the record contains no "demonstrably correlated, quantified basis on which EPA may reasonably have concluded that any particular population, or any population density, per se establishes that all urban areas having that same characteristic in gross are necessarily appropriate for inclusion as Phase II sources." Pointing to Leather Industries of America v. EPA, 40 F.3d 392, 401 (D.C.Cir.1994) (rejecting as arbitrary EPA's regulation of pollutant levels in the absence of data supporting a relationship between the caps and level of risk), Petitioners argue that EPA simply assumed the relationship Congress contemplated it would establish by the § 402(p)(5) studies.
EPA responds that it extensively documented the relationship between urbanization and harmful water quality impacts from stormwater runoff, pointing to its findings that the degree of surface imperviousness in an area directly corresponds to the degree of harmful downstream pollution from stormwater runoff, 64 Fed. Reg. at 68,724-27, and that it articulated a rational connection between these record facts and its decision to designate small MS4s serving areas of high population density ("urbanized areas") to protect water quality.
We treat EPA's decision with great deference because we are reviewing the agency's technical analysis and judgments, based on an evaluation of complex scientific data within the agency's technical expertise. See Baltimore Gas & Elec. Co. v. NRDC, 462 U.S. 87, 103, 103 S.Ct. 2246, 76 L.Ed.2d 437 (1983); see also Chem. Mfrs. Ass'n v. EPA, 919 F.2d 158, 167 (D.C.Cir.1990) ("It is not the role of courts to `second-guess the scientific judgments of the EPA....'"). We conclude that the record supports EPA's choice.
The statute simply called upon EPA to "designate stormwater discharges," other than those designated in Phase I, "to be regulated to protect water quality." 33 U.S.C. § 1342(p)(6). EPA did so, based on record evidence showing a compelling and widespread correlation between urban stormwater runoff and deleterious impacts on water quality. Petitioners' assertion that EPA failed to establish a "quantified" basis for its designation is inapposite. The statute did not require EPA to establish with pinpoint precision a numeric population threshold within urbanized areas that would justify regulation under Phase II. In areas implicating technical expertise and judgment, courts do not require "perfect stud[ies]" or data. Sierra Club, 167 F.3d at 662. EPA satisfied the Leather Industries standard by adopting a threshold consistent with the criterion of "protecting water quality," and did not assume, but instead sufficiently documented, the relationship between urbanization and harmful stormwater discharge.
3. Small Construction Sites